Teplovye SistemySolutionsEquipmentFuelProjectsDocumentsPublic sectorContactsCalculatorAboutGet an estimate

Projects

Over 600 sites since 2005. Open references with confirmed operating data.

Pellet production

Брянский ДОК

Bryansk region
6 × 2000 кВт
Fuel
Wood waste
Result
Drying sawdust for pellet production
6 years in operation
Furniture factory

«Шатура-мебель»

2 × 1000 кВт
Fuel
Chipboard waste
Result
Heating 22,000 m²
1 year in operation
Woodworking

«Феликс» / Жарковский ДОК

Tver region
2 × 800 кВт
Fuel
Chipboard waste
Result
Heating 12,000 m²
11 years in operation
Door manufacturing

«Профиль Дорс»

1 × 1000 + 1 × 2000 кВт, утилизатор 1 × 2000 кВт
Fuel
Chipboard waste
Result
Heating 11,000 m²
Furniture production

«Диваны MOON»

1 × 1000 кВт
Fuel
Wood waste
Result
Heating 8,000 m²
6 years in operation
MSW landfill

Полигон ТБО, г. Орёл (ЗАО «Экология»)

Oryol region
Энергоцентр на хвостах сортировки
Fuel
MSW sorting residues
Result
Disposal of sorting residues
Next step

We will size an energy centre for your site

Leave your details — an engineer will get in touch, clarify the task and prepare a quotation.

What helps us calculate

  • Type and volume of waste available as fuel
  • Heat demand: space heating, hot water, process
  • Location and climate zone
  • Current spending on disposal and fuel
Size your energy centre