OS waste-to-energy centre
Complete waste-fired boiler house: furnace, boiler, fuel feed and controls
A single shop-assembled unit. Waste is fed by screw from the hopper into the vortex furnace, where it is gasified and fully burned at high temperature. Heat goes into the hot-water boiler and on to heating, hot water or a process. The ShTR controller runs the whole system.
Price on request
Lead time: fixed in the quotation

Specifications
| 125 | 250 | 400 | 630 | 800 | 1000 | 1250 | 1500 | 2000 | |
|---|---|---|---|---|---|---|---|---|---|
| Output, kW | 125 | 250 | 400 | 630 | 800 | 1000 | 1250 | 1500 | 2000 |
| Output, Gcal/h | 0,1 | 0,215 | 0,34 | 0,54 | 0,68 | 0,86 | 1,1 | 1,29 | 1,72 |
| Boiler | КВр-125 | КВр-250 | КВр-400 | КВр-630 | КВр-800 | КВр-1000 | КВр-1250 | КВр-1500 | КВр-2000 |
| Vortex furnace | ТВ-125 | ТВ-250 | ТВ-400 | ТВ-630 | ТВ-800 | ТВ-1000 | ТВ-1250 | ТВ-1500 | ТВ-2000 |
| Chimney (min.), height × Ø, mm | 8000 × 325 | 9000 × 325 | 10000 × 426 | 10000 × 426 | 11000 × 530 | 11000 × 530 | 11000 × 630 | 11000 × 630 | 11000 × 720 |
Rated output at 35% fuel moisture. Flue gas temperature up to 250 °C. Scope of supply and layout are fixed in the project specification.
What is included
- Fuel moisture up to 60%
- Loose waste up to 50 mm, lump waste up to 1 m
- 1.2 m³ hopper with agitator
- Water temperature 70/95 °C
- Five layout options to fit the site
- Cascades of several units for higher capacity
Built for your task
Space heating, hot water, steam, drying, processes and electricity — every configuration is engineered for the site and fixed in the quotation and specification.
CalculatorNext step
We will size an energy centre for your site
Leave your details — an engineer will get in touch, clarify the task and prepare a quotation.
What helps us calculate
- Type and volume of waste available as fuel
- Heat demand: space heating, hot water, process
- Location and climate zone
- Current spending on disposal and fuel